
Things really moved after we left Sunday night and when I arrived at 6am Monday morning the house was looking great. Today I would make sure I got inside the house. My chance came as I took care of the food and drinks up by the site. I grabbed a case of water and headed in to get drinks to the guys inside. It was hot, dusty and filled with guys. I climbed over debris and deposited water on all 3 floors. The upstairs had 4 bedrooms, a laundry room and three full baths. Main level had living space, kitchen and dining area a coat closet, one bedroom and a full bath. Lower level had the garage, some kind of family room (?) and a bathroom. It also had a crawl space for storage.

While I supplied food the traditional way, Paul the designer had his own technique for feeding the guys.

The beginning of the kitchen. Everything they used in this house was top quality.
No comments:
Post a Comment